FOR MAIN CONTRACTORS
MEP subcontract packages for main contractors
We take AC, electrical, plumbing and combined multi-trade packages as a subcontractor, working inside your programme, your quality procedures, your HSE rules and your documentation requirements. AC, electrical, plumbing and integrated packages from one subcontractor instead of three.

Packages we take
HVAC Work Packages
Supply, install, test and commission split, ducted and package systems. Ventilation and air-filtration installation, modification and replacement.
Electrical Work Packages
Fitting contracting, containment, distribution boards, lighting and fixture installation, terminations, inspection and testing.
Plumbing Work Packages
First and second fix, sanitary ware installation, pipework, alterations, pressure testing and close-out.
Integrated MEP Support
All three trades under a single subcontract with one programme, one set of RFIs and one point of accountability. Includes snagging, defect rectification and defects-liability cover.
What main contractors can expect
One named contact for the site and one for the commercial side, with a written escalation route.
We read the drawings, BOQ, specification and programme before we mobilise, not after.
We build to the approved information and to your project instructions, and we raise an RFI rather than assume.
You get progress visibility, photographic records, and early warning on anything at risk - not on the day it slips.
We stay through inspection, snagging, handover and the defects-liability period.

Quality, HSE and governance
| Control | Our Approach | Client Benefit |
|---|---|---|
| Scope & Standards | Works executed per manufacturer specifications and applicable UAE codes | Consistent, code-compliant maintenance across every property |
| Right-First-Time | Standardized trade checklists (AC, electrical, plumbing) and technician training reduce repeat visits | Fewer callbacks, less downtime, lower cost of ownership |
| Inspection & Records | Scheduled preventive inspections logged digitally with photos and per-asset service history | Full transparency and audit-ready records anytime |
| HSE Discipline | Mandatory PPE, permit-to-work for high-risk tasks, HSE induction before site deployment | Safer sites for residents and staff, reduced liability |
| Communication | Single point of contact per contract, WhatsApp/email updates, defined response-time SLAs | Fast issue resolution, no chasing for status |
| Change Control | Any scope, schedule, or cost variation documented and approved before work proceeds | No surprise charges or unauthorized changes |

Who you would be working with
Technical delivery is owned by Romi Malkawi, Co-Founder and Technical Director. He spent eighteen years in maintenance and engineering leadership at one of the UAE's largest technical operations, running strategy and operations across a 35,000-unit fleet on an AED 500 million annual maintenance budget, and building an electromechanical modification operation that delivered an AED 120 million three-year project portfolio. He is a PMI-certified Project Manager, a Lean Six Sigma Green Belt, and a certified Lead Auditor across ISO 9001, 14001, 45001 and 27001. He is based in Dubai.
Pre-qualification pack
Available on request, usually within five working days:
Establishment card
Company profile
VAT registration certificate
Public liability and workmen's compensation insurance
HSE policy
Organisation chart and technician CVs
Reference list
Bank details on letterhead
FAQ
Frequently asked questions
Do you take single-trade packages, or only integrated MEP?
Both. AC, electrical and plumbing work packages can be taken individually, or combined under one subcontract if your programme suits it.
What's your turnaround on tender documents and site visits?
We respond to tender documents within five business days and can attend a site visit anywhere in the UAE. Works are delivered across Dubai and Northern Emirates.
Can you provide RAMS, method statements and the pre-qualification pack before we award?
Yes. The pre-qualification pack is available on request, usually within five working days - see what it includes below.
Do you work under our main contract's HSE and quality procedures, or your own?
Yours. We work inside your programme, your quality procedures, your HSE rules and your documentation requirements rather than applying our own in isolation.